quinta-feira, 8 de outubro de 2009

Wire Opera of Curitiba




A walkway on a lake of 7.200 m2, gives access to this theater that is a benchmark of modern architecture in Curitiba.

Built in a non-operating quarry, the stage occupies 400 m2 and has 1998 seats between audience and cabins. Opened in 1992, the project of the architect Dominic Bongestabs, was built in steel and covered with transparent polycarbonate. Added to this a cascade of ten meters high.

Um comentário: